If you're building an accessory dwelling unit (ADU) or backyard tiny home in unincorporated Los Angeles County, there's a single sheet of paper that quietly decides how fast your project moves: the site-specific plot plan. It's filed with the LA County Department of Regional Planning (DRP), and it's one of the most common spots where homeowners get a correction notice. Here's what it is and how to get it right the first time.
A site-specific plot plan is a scaled, top-down drawing of your exact lot, done on LA County's official template. It shows how your ADU fits the property: where the property lines are, how far the ADU sits from them (your setbacks), how tall it is, where every existing structure already stands, and where driveways, parking, and street or alley access fall.
Think of it as the bridge between a generic building design and your specific dirt. This matters most if you're using one of the County's pre-approved Standard Plans — either the free County Catalog or the Private Designer Catalog. With those, the building itself is already approved, so the plot plan is the piece that proves the pre-approved unit actually fits your yard within the zoning rules.
You need a DRP-approved plot plan if your property is in unincorporated LA County and you're filing through the County. If you're inside an incorporated city — the City of Los Angeles, Long Beach, Pasadena, and so on — you do not use Regional Planning or the County's EPIC-LA portal at all. Those cities run their own planning departments. So step one is always: confirm your address is unincorporated.
Reviewers are looking for a clean, to-scale drawing on the County template with all of the following:
The pre-approved Standard Plans themselves are free. Regional Planning charges a review fee per its current fee schedule (effective March 1, 2026), billed after you file. Building-permit and school fees come later and separately.
On timing, California ADU law requires the County to approve or deny a complete application within 60 days. A clean plot plan can clear DRP in a few weeks; a sloppy one that bounces for corrections drags the whole project.
Get the plot plan tight, and the rest of your ADU permitting gets a lot smoother. Questions on your specific lot? Regional Planning takes calls at (213) 974-6411.