License VerifiedServing San Diego, San Diego County · Based in San Diego, CA
New to the directory
Pricing on request — unlock TrueBuild ADU's ADU pricing for your project





TrueBuild ADU is a CSLB-verified contractor listed in San Diego County with classification B | C-8.
26+ years building ADUs · CSLB 770286 · B | C-8 - General Building Contractor
Pricing varies by unit type, size, finishes, and site conditions. Unlock TrueBuild ADU's project pricing for your lot — free, no obligation.
| Unit type | Typical size | Pricing |
|---|---|---|
| Studio / JADU | ≤ 500 sq ft | Pricing locked — unlock to view |
| 1-bedroom detached ADU | 600–750 sq ft | Pricing locked — unlock to view |
| 2-bedroom detached ADU | 750–1,000 sq ft | Pricing locked — unlock to view |
| Garage conversion | 400–600 sq ft | Pricing locked — unlock to view |
| Attached ADU | 400–800 sq ft | Pricing locked — unlock to view |
Pricing is unlocked per project
Share a few details and we'll send TrueBuild ADU's pricing for your build.
In-house design and full permit handling.
Turnkey ground-up and conversion builds.
Guidance and lender introductions.
ADU formats this builder takes on.
What's covered after move-in.
No reviews yet. Be the first to share your experience with TrueBuild ADU.
TrueBuild ADU is a full-service ADU builder serving San Diego, CA, handling design, permitting, and turnkey construction for detached ADUs, attached ADUs, garage conversions, and junior ADUs (JADUs). TrueBuild ADU is a vetted, license-verified ADU builder in our directory.
Yes. TrueBuild ADU holds an active CSLB license (770286), classified B | C-8 - General Building Contractor, and is bonded and insured.
TrueBuild ADU prices every ADU per project — your cost depends on size, finishes, and site conditions. Garage conversions are the most affordable path; detached units cost more. Pricing is unlocked per project: request a quote to get TrueBuild ADU's exact, no-obligation estimate for your lot.
TrueBuild ADU builds ADUs in San Diego, San Diego County.
Most ADU projects run 6–12 months end to end — roughly 1–2 months for design and permitting (California caps plan check at 60 days for compliant units) and 4–8 months of construction. TrueBuild ADU confirms a timeline for your specific project during the feasibility consultation.
Tap any "Get a Quote" button on this page to share a few details about your property and project. We'll confirm your service area, match you directly with TrueBuild ADU, and set up your free feasibility consultation — no obligation.